Metrics for Work Break Down Structures

Minimum Elements to Include in a WBS:

A useful work break down structure identifies 10 minimum elements. The elements are used to arrive at performance metrics for each project.

  • project start date
  • project end date
  • minimum amount of time per day to work on project's critical path
  • tasks
  • task dependencies
  • estimated task duration
  • tracks actual task duration
  • task completion status
  • assigned resources
  • availability of resources

Metrics for a Work Break Down Structure:

  • Total Duration on Critical Path
  • Total Labor-Time
  • Schedule Variance
  • Duration Variance
  • Availability Variance

All of the minimum elements in a WBS are used to compute the WBS metrics. When managing multiple projects, the above 5 metrics at quick glance allow project managers to evaluate which projects are advancing as a expected, which projects are ahead of schedule, and which project require attention.

Schedule variance, duration variance, and availability variance can each be converted into percentages for normalizing the metrics across projects.